Jump to content
Sign in to follow this  
acdii

Let the games begin

Recommended Posts

So I have been browsing the upcoming HyTi's on carsdotcom and found a few that have their stickers available, but havent been built yet. So based on what others have found with the date on their sticker and when ETIS shows the car being built, lets play the guessing game. Find a VIN and look at that date on the bottom.

 

3FA6P0RU2DR276929

Date 03 14 13

 

My guess, it will be built 3 25 13

Edited by acdii

Share this post


Link to post
Share on other sites
3FA6P0RU2DR276929

Date 03 14 13

 

My guess, it will be built 3 25 13

 

Edit - I say 3/23/13

Edited by jeff_h

Share this post


Link to post
Share on other sites

They build on Saturday? I was going to pick 23, but didnt know if the line ran on the weekend

Share this post


Link to post
Share on other sites

3FA6P0RU0DR281921

 

3-19-13

 

3-28-13

 

 

Grab a VIN and go, there are 14 to choose from that have stickers.

 

EDIT: 13, if its Ruby Red, the VIN doesn't have a sticker yet, guess still on Commodity Hold.

Edited by acdii

Share this post


Link to post
Share on other sites
They build on Saturday? I was going to pick 23, but didnt know if the line ran on the weekend

 

You posted in another thread that you had a slow work day and were surfing around... I've done that on dealer sites and checking windows stickers, then build dates on Etis, looking at the difference etc... from what I can tell by the build dates that pop up in Etis, yes there are Saturday builds, but I don't think I've encountered a Sunday build date (though this is just through random sampling only).

Share this post


Link to post
Share on other sites

So now the big question is, when will Ruby Red come out of Commodity Hold?

Share this post


Link to post
Share on other sites

I win.

 

The car in question (3FA6P0RU2DR276929) was built 3/21.

 

Primary Features

Build Date: 21.03.2013

Vehicle Line: Transit Connect 2002-

Engine: 2.0 4V DOHC PFI Gas/Electric

Transmission: ECVT Auto Trans Power Split

Hint: add 7 days to the date on the window sticker and it will usually be the build date.

AHA not always true, could have something to do with the paint though.

 

3FA6P0RU5DR278139

 

03 14 13 Not built yet.

 

White Platinum

Share this post


Link to post
Share on other sites
So now the big question is, when will Ruby Red come out of Commodity Hold?

 

Sounds like a temporary glitch, didn't it? That next commodity letter noted that only the Ruby Red retail orders would be scheduled the next go-around IIRC, so someone needed to fill another couple paint buckets and off they go -- we hope!

Share this post


Link to post
Share on other sites

Yeah, so maybe next week. The two I looked at havent posted stickers yet, unless the system hasnt updated from yesterday.

Share this post


Link to post
Share on other sites
Yeah, so maybe next week. The two I looked at havent posted stickers yet, unless the system hasnt updated from yesterday.

 

Same as my order #2, scheduled-to-day 3/18 but still no window sticker, I expect it was kicked back a couple weeks, bumped the cyberdman thread so hope to find out on Monday.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
Sign in to follow this  

×
×
  • Create New...