Jump to content
Sign in to follow this  
Eddie Sessum

How to find build date?

Recommended Posts

I keep seeing all these TSB in april which is the month mine was built but I cant find the exact build date. Is there a website? I see the people saying its on the window stick from the ford site but for mine its not.

Share this post


Link to post
Share on other sites

So it appears i got a 4-27 build date. That works I guess as it puts me past most of the issues other than one recall that doesnt showup because its battery related in under 0*

Share this post


Link to post
Share on other sites

How often is ETIS updated?

 

When I put in my VIN it shows 3 Outstanding Field Service Actions which were already updated by my dealer.

 

Outstanding Field Service Actions

12A04 - SYNC WITH MYFORD/MYLINCOLN TOUCH - APPLICATION PERFORMANCE UPGRADE
12M02 - SYNC WITH MYFORD/MYLINCOLN TOUCH - WARRANTY EXTENSION COVERING ACCESSORY PROTOCO L INTERFACE MODULE (APIM)
13B07 - POWERTRAIN CONTROL MODULE (PCM) CALIBRATION

 

Thanks

Share this post


Link to post
Share on other sites

How often is ETIS updated?

 

When I put in my VIN it shows 3 Outstanding Field Service Actions which were already updated by my dealer.

 

Outstanding Field Service Actions

12A04 - SYNC WITH MYFORD/MYLINCOLN TOUCH - APPLICATION PERFORMANCE UPGRADE

12M02 - SYNC WITH MYFORD/MYLINCOLN TOUCH - WARRANTY EXTENSION COVERING ACCESSORY PROTOCO L INTERFACE MODULE (APIM)

13B07 - POWERTRAIN CONTROL MODULE (PCM) CALIBRATION

 

It took 10 days for the 13B07 update to disappear from mine, and those other ones related to sync may stay there for a lot longer since it relates to the warranty extension (don't know if both would be that way, though)

Share this post


Link to post
Share on other sites

That is pretty much my assessment as well, that the date on the window sticker is when the factory starts processing their paperwork for that specific build, including building up the window sticker, and also when they start getting all of the preassembled part assemblies scheduled and lined up for the build.

 

As far as how long it takes the build to be completed from actual start to actual finish though the factory line seems to usually only take a day or two from what info I have been able to gather. And the date when the vehicle leaves the factory line in a completed state is the build date which we see in ETIS.

Edited by Hybrider

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
Sign in to follow this  

×
×
  • Create New...